EN | FR

Fabrication facility

The facilities have over 20,000 sq. ft. of interior flooring and over 235,000 sq. ft. of exterior area.

Our facility allows us to be completely self-sufficient in regards with the following processes used in steel fabrication.

  • Drilling
  • Plasma and flame cutting
  • Sawing
  • Welding
  • Machining
  • Assembling
  • Zinc Metalizing
  • Sandblasting and Painting